Skip to content
Island Tile Craft logo
Finished marble shower with a hexagon mosaic floor and two drains

Tile & Stone Contractor

Schluter certified

Tile work to outlast the house

Showers, floors and leak repairs, done by Louis Chirco and his crew. 30+ years on Long Island, Islip out to the Hamptons.

  • 30+Years in the trade
  • SchluterCertified installer
  • Licensed& insured, proof on request
  • FreeOn-site estimates

Schluter certified

Louis Chirco has completed the full Schluter training, and he's on the job doing the work himself. The membrane, the drain and the waterproofing go in the way the system was designed, by the guy who was trained on it.

What that means for your job

Why Island Tile Craft

Why homeowners hire him

  1. 01

    Lou's own crew

    Louis Chirco walks the job and writes the estimate, and his own crew does the work. It isn't handed off. Need a plumber or electrician? We'll recommend licensed pros we've worked beside for years.

  2. 02

    Bonded waterproofing

    The pan gets a sloped mortar bed, then a bonded membrane over it, and every seam and corner is sealed. It gets flood tested before any tile goes down.

  3. 03

    Old-school mud work

    Floated mortar beds and mud-set pans, done by hand. Most installers never learned it.

  4. 04

    You get a number, in writing

    A written scope before anyone starts. If something changes once the walls are open, you hear about it that day, and you hear what it costs.

How we build

Built on Schluter systems.

Waterproofing, uncoupling and radiant heat out of one system, over a mud bed floated by hand.

How we use each one
  • KERDI

    Bonded shower waterproofing

  • KERDI-BOARD

    Waterproof walls, benches & niches

  • KERDI-DRAIN & KERDI-LINE

    Drains that bond to the membrane

  • DITRA

    Uncoupling under floor tile

  • DITRA-HEAT

    Electric radiant floor heat

  • Profiles & trim

    Finished edges and transitions

One bathroom, start to finish

How a shower goes together

Same job, in order. The old pan came out, the mud bed went in over the radiant tubing, KERDI went over the mud, and the marble went on last. These are Lou's photos from that bathroom.

  1. Shower floor demolished to the joists with radiant tubing exposed01

    Tear it out

    The old pan comes out down to the joists. Whatever failed gets found and fixed before anything new goes in.

  2. Mortar bed floated over wire lath with radiant tubing inside it02

    Float the mud bed

    Packed mortar over wire lath, floated flat and sloped by hand, with the radiant tubing encapsulated in it.

  3. Schluter KERDI membrane bonded over the mortar bed around two drains03

    Bond the waterproofing

    Schluter KERDI bonded to the mud bed, drains tied in, corners and seams sealed, then flood tested.

  4. Finished marble shower with a hexagon mosaic floor04

    Set the tile

    Marble walls and a hex mosaic floor, set on a base that's dead flat, fully supported and completely waterproof.

Recent work

Featured projects

View the full gallery
Finished marble shower with a hexagon mosaic floor and two drainsMarble mosaic shower floor with a stainless linear drainSchluter KERDI membrane bonded over a shower pan with two drainsMortar bed floated over wire lath and radiant tubingSubway tile shower wall with fixture escutcheons cut in cleanlySchluter KERDI shower pan and mud curb below marble walls

Thinking about your own project?

Text a photo of the room and you'll usually hear back the same day with a ballpark. Or just call and talk it through with Lou.

How it works

Phone call to finished room

  1. 01

    Call and talk it through

    Tell Lou the room, the rough size, and what you have in mind. Most of the time he can give you a ballpark right on the phone.

  2. 02

    On-site measure & written estimate

    We come out, check substrate and plumbing, review material options, and leave you with a written scope and price.

  3. 03

    Build it right, clean up, walk through

    Demo, prep, waterproofing, tile, grout, seal. Daily cleanup. A final walkthrough before we call it done.

For production builders

Certified tile across a whole subdivision, at a number that protects your margin.

If you're putting up 30 to 40 homes a year, tile is a line item that either runs on schedule or holds up your closings. Volume gets priced differently than one-off bathrooms. Same Schluter certified crew, same spec in every house, at builder pricing, on a schedule you can plan a subdivision around.

How we work with builders

Pricing a community?

Call or text with the number of homes, the plans and your timeline, and we'll put builder pricing together.

Where we work

Serving Suffolk County, Long Island.

Based on Long Island and working from Islip to the Hamptons, with bigger projects out east.

Every community we serve

Amagansett Bay Shore Bayport Belle Terre Bellport Blue Point Bohemia Brentwood Bridgehampton Brightwaters Centereach Central Islip Commack Coram East Hampton East Islip East Quogue Farmingville Fort Salonga Great River Hampton Bays Hauppauge Head of the Harbor Holbrook (Islip side) Holtsville Islip Islip Terrace Kings Park Lake Grove Lake Ronkonkoma (Smithtown side) Medford Middle Island Miller Place Montauk Mount Sinai Nesconset Nissequogue North Sea Noyac Oakdale Old Field Patchogue Port Jefferson Port Jefferson Station Quogue Remsenburg Ridge Rocky Point Ronkonkoma (Islip side) Sag Harbor Sagaponack Sayville Selden Setauket Shinnecock Hills Shoreham Smithtown Sound Beach Southampton Springs St. James Stony Brook Village of the Branch Wainscott Water Mill West Islip West Sayville Westhampton Westhampton Beach Yaphank

Free estimates

Ready to talk about your project?

Call 631-767-0183
Call 631-767-0183Text